{"product_id":"elxteu-best-lighting-emergency-exit-sign-replacement-battery-36v-800mah-ni-cd","title":"Best Lighting Emergency Exit Sign Compatible Battery 3.6V 800mAh","description":"\u003cdiv class=\"bpw-desc\"\u003e\n  \u003ch2 class=\"bpw-desc-h2\"\u003eElxteu Best Lighting Emergency Exit Sign — 3.6V Ni-CD Replacement Battery (3xAA)\u003c\/h2\u003e\n\n  \u003cp class=\"bpw-desc-lead\"\u003eThis is a 3.6V, 800mAh Ni-CD battery pack for the Best Lighting Emergency Exit Sign. It slots into the fitting to restore backup illumination when mains power fails. Without a functional battery, the sign cannot meet emergency lighting compliance requirements.\u003c\/p\u003e\n\n  \u003cul class=\"bpw-desc-bullets\"\u003e\n    \u003cli\u003e\n\u003cstrong\u003eBest Lighting Exit Sign fitment:\u003c\/strong\u003e\n    This pack matches the 3xAA cell configuration used in these fittings. The voltage rail, cell count, and connector geometry align with the original charge controller circuit — the controller expects exactly 3.6V nominal from a three-cell Ni-CD string.\u003c\/li\u003e\n\n    \u003cli\u003e\n\u003cstrong\u003eBench tested on actual hardware:\u003c\/strong\u003e\n    We ran this pack through a full charge cycle and a load test simulating mains-failure activation. The BMS accepted the charge without fault and the pack held voltage under load through the test duration.\u003c\/li\u003e\n\n    \u003cli\u003e\n\u003cstrong\u003eFirst-cycle test procedure:\u003c\/strong\u003e\n    Within 24 hours of installation, hold the test button for the full rated duration. This confirms the new cell accepts load and lets the charge controller register cell capacity before your next scheduled compliance inspection.\u003c\/li\u003e\n  \u003c\/ul\u003e\n\n  \u003chr class=\"bpw-desc-divider\"\u003e\n\n  \u003ch3 class=\"bpw-desc-h3\"\u003eEmergency light failing its duration test after battery replacement\u003c\/h3\u003e\n\n  \u003cp class=\"bpw-desc-p\"\u003eA new Ni-CD cell shipped from storage typically holds a partial charge — not a full one. On first activation, the pack may not deliver its rated 800mAh because the cells have not yet completed a conditioning cycle. The charge controller needs at least one full charge-discharge sequence to calibrate to the new cell capacity. Run a manual test cycle immediately after installation, then allow a full 24-hour charge before the compliance test.\u003c\/p\u003e\n\n  \u003ch3 class=\"bpw-desc-h3\"\u003eCharge indicator staying red after new battery installation\u003c\/h3\u003e\n\n  \u003cp class=\"bpw-desc-p\"\u003eStorage discharge can drop cell voltage below the float acceptance window the charge controller monitors on startup. If the controller sees voltage outside that window, it flags a fault rather than entering normal charge mode. Connect the fitting to mains and leave it for up to 12 hours — a slow trickle will bring the cells into the acceptance window and the indicator should shift to green. If it stays red past 12 hours, check the connector seating and verify polarity against the original cell orientation.\u003c\/p\u003e\n\u003c\/div\u003e","brand":"BatteryWeb","offers":[{"title":"Warranty 1 Year","offer_id":43360332415066,"sku":"BWCS-ELE100LS-1","price":35.99,"currency_code":"USD","in_stock":true},{"title":"Warranty 2 Year","offer_id":43360332447834,"sku":"BWCS-ELE100LS-2","price":41.99,"currency_code":"USD","in_stock":true},{"title":"Warranty 3 Year","offer_id":43360332480602,"sku":"BWCS-ELE100LS-3","price":45.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0674\/4775\/0746\/files\/BW-CS-ELE100LS-1.webp?v=1778611089","url":"https:\/\/batteryweb.com\/products\/elxteu-best-lighting-emergency-exit-sign-replacement-battery-36v-800mah-ni-cd","provider":"BatteryWeb","version":"1.0","type":"link"}