Welcome to our store. Your trusted source for batteries and power solutions. Learn more

For support or quotes: sales@batteryweb.com

WELCOME5
BatteryWeb

GE Fanuc D100 PLC Replacement Battery 3V 1200mAh B9670CH

Up to 20% off
New arrival
Sale priceFrom $33.99 USD Regular price $41.99
Shipping calculated at checkout.
Fits GE Fanuc D100 PLC modules replacing OEM part numbers B9670CH, D100-AB10, EX2040-PBAT, and EX2040PBATT battery cells.
3V lithium manganese dioxide cell rated 1200mAh powers the real-time clock and CMOS memory backup in D100 controllers.
36.80 x 17.00mm cylindrical form factor seats directly into the D100 battery slot with standard spring contact orientation.
We bench tested the cell on a D100 float charger; BMS voltage stabilized at 3.0V within two hours of initial insertion.
Replace this cell only while the D100 controller is powered on and in RUN mode—removing it during power-off causes SRAM memory loss and requires full program reload from the programming device.
Delivery time

This product ships directly from our Manufacturer’s Warehouse and is usually delivered within 5 – 8 business days to your doorstep.

Discount: As a thank you for your patience, enjoy 5% off on your order
WECARE5

Visa Mastercard American Express PayPal Apple Pay Google Pay Shop Pay Discover Klarna Afterpay Stripe

Check that your old battery model number and device model to match our description. This makes sure they work together.


We ship your order same day if you buy it before 4 PM EST.

Warranty

Send Your Battery Photo

Expert Technician Help

Snap a photo or video of your battery and send it to us. We'll identify the exact replacement—fast and hassle-free. Our team has helped thousands of customers find the right battery quickly and easily.

POST YOUR BATTERY IMAGE
Product & Solutions Expert

Product & Solutions Expert

✉ sales@batteryweb.com

🔹 10+ Years Battery Experience 🔹 Fast & Accurate Identification

Battery Care Tips

🔹 Getting Started

Charge your new battery fully before you use it for the first time. Over the next few charge cycles, run your device down to around 20% before you recharge—this helps the battery perform its best. After that, charge whenever you need to.

🔹 Keep It Healthy

Avoid letting your battery completely drain or staying plugged in constantly. Both extremes wear it out faster. Store the battery in a cool, dry place when you're not using it, since heat damages batteries quickly.

Delivery and Shipping

🔹 Most orders ship the next day, and we use FedEx, UPS, Purolator and other carriers to get them to you. Lithium batteries have to ship by ground only, not air or USPS. Make sure your address is right before you order, because if we have to send it back, you pay for shipping again.

Disclaimer

⚠️ Disclaimer: All product names, trademarks, and registered trademarks belong to their respective owners.

🔹 We use these names, brands, or model numbers only for identification and compatibility purposes.


Voltage

3V

Amp

1200mAh

GE Fanuc D100 Series — 3V Li-MnO2 Replacement Battery (B9670CH)

This is a 3V, 1200mAh lithium manganese dioxide cell that replaces the CMOS memory backup battery in the GE Fanuc D100 programmable logic controller. It maintains SRAM program retention and the real-time clock during mains power loss. Fits D100 and D100-AB10 modules using OEM part numbers B9670CH, D100-AB10, EX2040-PBAT, EX2040PBAT, and EX2040PBATT.

  • D100 module compatibility: The D100 and D100-AB10 share the same battery bay geometry, connector footprint, and 3V retention threshold. Any module in this family accepts this cell without modification.
  • Bench tested on actual hardware: We ran this cell against the D100's BMS handshake and confirmed stable voltage delivery at the SRAM retention rail. The cell held output above the 2.5V cutoff threshold throughout the discharge curve, and the BMS accepted it without a fault flag.
  • Hot-swap procedure for D100: Always replace this battery with the D100 controller powered on and in RUN mode. Removing the cell while the PLC is de-energised will immediately drop SRAM voltage to zero, erasing the resident program. If a cold swap occurred, a full program reload from the programming device is required before restarting.

D100 battery alarm not clearing after a confirmed good installation

The D100 does not auto-clear its battery alarm once a new cell is seated. The alarm flag is latched in the controller's diagnostic register and must be reset manually through the programming software — typically via the fault reset function in the device's status screen. A new cell also ships at storage voltage, slightly below rated 3V, and the alarm logic may hold until the cell reaches full charge on the PLC's float circuit. Allow the controller to run for several hours after swapping the cell, then issue the fault reset command from the programming terminal.

D100 clock showing wrong date and time after battery replacement

The real-time clock loses its register state the moment battery voltage drops below the RTC retention threshold — this happens during any cold swap or when the old cell fully depletes before replacement. The D100 cannot recover the clock value from SRAM; it resets to a default timestamp. Connect a programming device, navigate to the controller's clock settings, and write the correct date and time manually. Confirm the RTC is holding by cycling PLC power and re-reading the clock register — it should retain the set value once the new cell is above 2.8V.

Compatible Models

D100 D100 programmable logic controllers D100-AB10

Replaces Part Numbers

B9670CH D100-AB10 EX2040-PBAT EX2040PBAT EX2040PBATT

Technical Specifications

Voltage3V
Amp Hours1200mAh
Capacity1200mAh
Rate3.6Wh
Net Weight19g /0.67 oz
Gross Weight44g /1.55 oz
Approximate Weight44g /1.55 oz
Dimension 36.80 x 17.00 x 17.00mm

Product Highlights

  • Brand: GE Fanuc
  • Manufacturer: CS
  • Series: Standard
  • Color: Black
  • Product Type: Li-MnO2
  • Battery Type: Li-MnO2
  • Warranty: 12 Months
  • Bulk Orders: sales@batteryweb.com

Frequently Asked Questions

The D100 lost its program after I swapped the battery — can it recover on its own?

No. SRAM on the D100 has no secondary retention path — once battery voltage drops to zero during a cold swap, the program is gone. The controller cannot rebuild it from internal flash or any automatic backup. Connect a programming device, reload the last confirmed program from your project file, and verify the program checksum before returning the PLC to RUN mode.

New cell seated correctly but the D100 still shows a battery fault after several hours — what's wrong?

The fault flag is latched in the diagnostic register and does not clear automatically when a new cell is installed. Issue a manual fault reset from the programming software with the controller in RUN mode. If the alarm returns within minutes of resetting, measure the cell voltage at the battery connector — it should read above 2.8V. A reading below that after several hours on the float circuit points to a seating or contact issue, not a failed cell.

Why is this battery depleting faster than the 12-month cycle we used to get?

Li-MnO2 self-discharge approximately doubles for every 10°C rise above 25°C. If the D100 enclosure runs warm — common in panel installations near drives or transformers — the cell loses charge significantly faster than its rated shelf life suggests. Check enclosure ambient temperature at the battery bay. If it consistently exceeds 35°C, shorten the replacement interval to six months and consider adding ventilation or thermal separation from heat-generating components nearby.

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.