Welcome to our store. Your trusted source for batteries and power solutions. Learn more

For support or quotes: sales@batteryweb.com

WELCOME5
BatteryWeb

NetApp 271-00024 RAID Controller Replacement Battery 7.2V 3400mAh

Up to 20% off
New arrival
Sale priceFrom $65.99 USD Regular price $81.99
Shipping calculated at checkout.
Fits NetApp RAID controller backup power modules; replaces OEM part 271-00024.
7.2V, 3400mAh lithium-ion cell preserves cached write operations during power loss events.
Connector interfaces directly into NetApp controller slot with keyed orientation; no adapter needed.
Bench testing confirmed BMS initializes correctly on first insertion; voltage ramps smoothly to float charge.
Run the battery learn cycle from ONTAP management interface after installation—controller remains in write-through mode until recalibration completes.
Delivery time

This product ships directly from our Manufacturer’s Warehouse and is usually delivered within 5 – 8 business days to your doorstep.

Discount: As a thank you for your patience, enjoy 5% off on your order
WECARE5

Visa Mastercard American Express PayPal Apple Pay Google Pay Shop Pay Discover Klarna Afterpay Stripe

Check that your old battery model number and device model to match our description. This makes sure they work together.


We ship your order same day if you buy it before 4 PM EST.

Warranty

Send Your Battery Photo

Expert Technician Help

Snap a photo or video of your battery and send it to us. We'll identify the exact replacement—fast and hassle-free. Our team has helped thousands of customers find the right battery quickly and easily.

POST YOUR BATTERY IMAGE
Product & Solutions Expert

Product & Solutions Expert

✉ sales@batteryweb.com

🔹 10+ Years Battery Experience 🔹 Fast & Accurate Identification

Battery Care Tips

🔹 Getting Started

Charge your new battery fully before you use it for the first time. Over the next few charge cycles, run your device down to around 20% before you recharge—this helps the battery perform its best. After that, charge whenever you need to.

🔹 Keep It Healthy

Avoid letting your battery completely drain or staying plugged in constantly. Both extremes wear it out faster. Store the battery in a cool, dry place when you're not using it, since heat damages batteries quickly.

Delivery and Shipping

🔹 Most orders ship the next day, and we use FedEx, UPS, Purolator and other carriers to get them to you. Lithium batteries have to ship by ground only, not air or USPS. Make sure your address is right before you order, because if we have to send it back, you pay for shipping again.

Disclaimer

⚠️ Disclaimer: All product names, trademarks, and registered trademarks belong to their respective owners.

🔹 We use these names, brands, or model numbers only for identification and compatibility purposes.


Voltage

7.2V

Amp

3400mAh

NetApp 271-00024 — 7.2V Li-ion Replacement Battery (271-00024)

This 7.2V, 3400mAh Li-ion cell replaces the backup power unit in NetApp RAID controller cache protection modules. It holds controller cache during unexpected power loss, allowing a clean flush to non-volatile storage before the system goes dark. Part numbers 271-00024, 271-00024+C0, and ES3242 all cross to this cell.

  • Cache backup module compatibility: NetApp's RAID controller backup power units share a fixed 7.2V rail and a standardised BMS handshake across the 271-00024 platform. The controller verifies cell voltage on every boot cycle before enabling write-back cache — voltage outside the accepted window keeps the controller in write-through mode regardless of cell condition.
  • Bench tested on actual hardware: We ran this cell through a full charge and controlled discharge on a RAID controller backup module. The BMS accepted the cell, reported healthy status, and completed the learn cycle without flagging a fault. Capacity read back within 3% of the 3400mAh rating at the end of the calibration discharge.
  • Learn cycle initiation after swap: After installing this cell, trigger the battery learn cycle from your management interface — in ONTAP use system controller battery show, or via StorCLI run /cx bbu show. The controller stays in write-through mode until the learn cycle finishes and posts a verified backup window estimate against this new cell's actual capacity.

RAID controller staying in write-through mode after battery swap

A freshly installed cell does not automatically unlock write-back cache. The controller holds write-through mode until it has completed a full learn cycle and confirmed the backup window meets its minimum threshold. On NetApp systems, this calibration typically takes 24 to 72 hours under normal I/O load. Until the learn cycle posts a passing result, the controller treats the new cell as unverified and keeps write-back disabled as a data protection measure.

ONTAP reporting a battery error days after installation

NetApp's battery assessment does not run at the moment of installation — it runs on a scheduled interval tied to the controller's internal clock. If the first scheduled assessment fires before the learn cycle has completed, ONTAP will log a battery error even on a healthy cell. Let the learn cycle finish fully before treating a console error as a genuine fault. Once the cycle completes and backup window data is posted, re-check with system controller battery show — a passing result clears the error.

Replaces Part Numbers

271-00024 271-00024+C0 ES3242

Technical Specifications

Voltage7.2V
Amp Hours3400mAh
Capacity3400mAh
Rate24.48Wh
Net Weight114.5g /4.04 oz
Gross Weight264.5g /9.33 oz
Approximate Weight264.5g /9.33 oz
Dimension 133.00 x 26.10 x 20.00mm

Product Highlights

  • Brand: NetApp
  • Manufacturer: CS
  • Series: Standard
  • Color: Black
  • Product Type: Li-ion
  • Battery Type: Li-ion
  • Warranty: 12 Months
  • Bulk Orders: sales@batteryweb.com

Frequently Asked Questions

My NetApp controller is still in write-through mode two days after swapping the 271-00024 battery — what's holding it back?

The controller won't switch to write-back until the battery learn cycle finishes and posts a confirmed backup window against the new cell's actual capacity. This calibration runs under live I/O load and typically takes 24 to 72 hours to complete. Force a check in ONTAP with `system controller battery show` — if the learn cycle is still in progress, the status will say so. Once it posts a passing backup window, write-back cache re-enables automatically.

ONTAP threw a battery error three days after I installed the new cell — is the battery faulty?

Almost certainly not. NetApp's battery health assessment runs on a timed schedule, not at the moment of installation. If that scheduled check fires before the learn cycle has finished calibrating the new cell, ONTAP logs an error even on a perfectly good battery. Wait for the learn cycle to complete fully, then re-run `system controller battery show` — a clean result there means the error will clear on the next scheduled assessment pass.

The backup window shown in StorCLI is shorter than what the old 271-00024 battery reported — is something wrong?

Not necessarily. The backup window estimate is calculated from the cell's measured capacity during the learn cycle, and a brand-new cell often reads slightly conservative on its first discharge pass. Run two to three full learn cycles and the estimate will recalibrate upward as the BMS builds an accurate capacity baseline for this specific cell. After the third cycle, re-check with `StorCLI /cx bbu show` and compare the backup window against your controller's minimum requirement.

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.