Bard Site Rite 5 Replacement Battery DR206 10.8V 5200mAh
Check that your old battery model number and device model to match our description. This makes sure they work together.
We ship your order same day if you buy it before 4 PM EST.
Bard Site Rite 5 Replacement Battery DR206 10.8V 5200mAh - is backordered and will ship as soon as it is back in stock.
Let customers speak for us
Send Your Battery Photo
Expert Technician Help
Snap a photo or video of your battery and send it to us. We'll identify the exact replacement—fast and hassle-free. Our team has helped thousands of customers find the right battery quickly and easily.
POST YOUR BATTERY IMAGE
Product & Solutions Expert
✉ sales@batteryweb.com
Battery Care Tips
Battery Care Tips
🔹 Getting Started
Charge your new battery fully before you use it for the first time. Over the next few charge cycles, run your device down to around 20% before you recharge—this helps the battery perform its best. After that, charge whenever you need to.
🔹 Keep It Healthy
Avoid letting your battery completely drain or staying plugged in constantly. Both extremes wear it out faster. Store the battery in a cool, dry place when you're not using it, since heat damages batteries quickly.
Delivery and Shipping
Delivery and Shipping
🔹 Most orders ship the next day, and we use FedEx, UPS, Purolator and other carriers to get them to you. Lithium batteries have to ship by ground only, not air or USPS. Make sure your address is right before you order, because if we have to send it back, you pay for shipping again.
Disclaimer
Disclaimer
⚠️ Disclaimer: All product names, trademarks, and registered trademarks belong to their respective owners.
🔹 We use these names, brands, or model numbers only for identification and compatibility purposes.
Bard Site Rite 5 Replacement Battery DR206 10.8V 5200mAh - is backordered and will ship as soon as it is back in stock.
Voltage
10.8V
Amp
5200mAh
Bard Site Rite 5 / Site Rite 6 — 10.8V Li-ion Replacement Battery (DR206)
This 10.8V, 5200mAh lithium-ion battery replaces the OEM pack in the Bard Site Rite 5 and Site Rite 6 portable ultrasound systems. It matches the voltage rail, connector, and BMS communication protocol of the original DR206 cell. Capacity is sourced from product data — 56.16Wh total.
- Site Rite 5 and Site Rite 6 compatibility: Both units share the same internal battery bay geometry, 10.8V nominal rail, and BMS handshake protocol — the same physical and electrical pack services both platforms without modification.
- Bench tested on actual hardware: We cycled this cell through charge and discharge on the Site Rite platform. The BMS accepted the pack on first insertion, completed its initialisation handshake, and reported state-of-charge correctly across the full voltage range from 12.6V to 9.0V.
- Post-swap startup protocol: After installing this battery, allow the Site Rite to complete its full power-on self-test without interruption. Medical device BMS verification runs at startup — cutting power mid-sequence creates a persistent false battery fault that won't clear until the next complete reboot.
Site Rite 6 battery fault flag persisting after confirmed full charge
The Site Rite 6's charge management IC applies a conservative acceptance threshold calibrated to the OEM cell's internal resistance profile. A new replacement cell with a slightly different impedance signature can trip this threshold, causing the device to log a battery fault even when the pack reads fully charged at 12.6V. Running one complete charge-discharge cycle allows the BMS to update its learned resistance baseline and clear the flag. Do not present the device for clinical use until that first full cycle is complete and the fault indicator is gone.
Device not completing boot sequence after battery sat in storage
Lithium-ion cells self-discharge during storage. If a replacement pack has sat long enough to drop below approximately 9.0V, the Site Rite's BMS will refuse to boot — the device goes dark or shows a flat battery icon with no further response. Connect the device to mains power via the AC adapter and leave it charging for a minimum of 30 minutes before attempting to power on. This allows the charge IC to trickle the cell back above the BMS recovery threshold, after which normal boot proceeds.
Compatible Models
Replaces Part Numbers
Technical Specifications
Product Highlights
- Brand: Bard
- Manufacturer: CS
- Series: Standard
- Color: Black
- Product Type: Li-ion
- Battery Type: Li-ion
- Warranty: 12 Months
- Bulk Orders: sales@batteryweb.com
Frequently Asked Questions
The Site Rite 5 is showing a low battery alarm immediately after I installed and charged the new battery — what's wrong?
The Site Rite's BMS compares the new cell's charge acceptance curve against the OEM chemistry baseline stored in firmware. On a fresh replacement pack, that curve doesn't match yet, so the device interprets it as a weak cell and triggers the alarm even at full charge. Run one complete charge-discharge cycle — charge to 12.6V, let the device discharge in normal use, then charge fully again. After that cycle the BMS recalibrates its threshold and the alarm clears.
The charge indicator on the Site Rite 6 stops climbing before it reaches 100% — is the new battery defective?
It's not defective. The charge IC applies a conservative current limit on a new cell with unverified internal resistance, so it terminates the charge stage early on the first attempt. On the second charge cycle the IC uses measured resistance data from the first cycle to set the correct termination point, and the indicator will reach 100%. Keep the device on AC power through that second full charge before drawing on the battery in a procedure.
The Site Rite 5 is shutting off unexpectedly mid-examination — what's causing that?
New lithium-ion cells have slightly elevated internal resistance in the first 10 cycles. The imaging load during active use draws enough current to create a momentary voltage sag that the BMS reads as an undervoltage condition, triggering a protective shutdown at roughly 9.0V cell terminal voltage. The cell's resistance drops as it breaks in, so early shutoffs become less frequent with each cycle. Condition the pack with three to five full charge-discharge cycles on the bench before using it in patient care settings.
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
Related Products
Engineered for Performance. Built to Last.
Check out our top-rated selection of reliable products built to last. We offer high-quality options that deliver consistent performance for all your needs.






